A sales budget is a company's plan for how much it expects to sell in a period and what it will spend to make those sales. The revenue side is budgeted units times budgeted price. The cost side is the sales team: salaries, commissions, benefits and programs. In SaaS, units are new logos and price is ACV.

A sales budget is a company's plan for how much it expects to sell in a period and what it will spend to make those sales. The revenue side is budgeted units times budgeted price. The cost side is the sales team: salaries, commissions, benefits and programs. In SaaS, units are new logos and price is ACV.

Most guides stop at the first half: multiply units by price and call it the budget. That leaves out the question a CRO and a CFO argue about every planning season: can the team you have, plus the people you plan to hire, actually sell that number, and what does it cost? This guide builds both halves for a subscription company, checks the bookings against rep capacity with a real ramp, and ends with a free template that does all of it.

Free sales budget template (Excel and Google Sheets)
Seven tabs: Start here, Inputs, Sales budget, Capacity, Expense budget, Summary, Budget vs actual. No macros, no sign-up. In Google Sheets use File, Import, Upload.

What is a sales budget?

A sales budget is the plan for the sales a company expects in a period, in units and in dollars, together with the spending needed to win them. In accounting it is the first schedule of the master budget, because production, purchasing, hiring and cash plans all start from it. Inside a sales team, "the sales budget" often means the other half: what the sales function is allowed to spend.

Both meanings are correct, and a useful sales budget holds both. It sits next to three numbers that people often mix up with it.

Sales budgetSales forecastQuotaSales expense budget
Question it answersWhat do we plan to sell this year?What will actually close?What do we ask each rep to sell?What may the sales team spend?
SetOnce, before the year startsEvery week or monthOnce a year, per repOnce, with the budget
Changes during the yearRarely; a reforecast sits next to itConstantly, as deals moveRarely, by plan rulesRarely
Built fromUnits x price by product and period, plus expansion and churnPipeline, win rates, renewal datesThe budget, plus a cushion for reps who missHeads, pay plans, programs
SaaS unitBookings (new-logo and expansion ARR) and revenueBookings and revenueBookingsDollars of sales cost
OwnerCFO and CRO togetherRevOps and sales leadersCRO and sales opsCRO with finance
The budget and the forecast are supposed to drift apart once the year starts, and managing that gap is the job. The forecast vs budget entry covers how. Quotas usually add up to more than the budget, because some reps will miss.
Put this to work on your numbers
Run your own numbers with the free Sales Plan Template, then see how ORM builds it into a custom model.

What is the sales budget formula?

Budgeted sales = budgeted units x budgeted price per unit, for each product and each period, added together. A company that plans to sell 12 Core subscriptions at $30,000 and 4 Enterprise subscriptions at $90,000 in a quarter has budgeted sales of $360,000 + $360,000 = $720,000 for that quarter.

The textbook version stops there, with units of a physical product at a list price. A subscription company has to translate each part:

Textbook termSaaS versionWhy it matters
Units soldNew logos (or seats) by planNew customers carry a different cost to win than seats added to existing accounts
Price per unitAnnual contract value (ACV) by planPlans can differ in price several times over, so one blended price hides the mix
SalesBookings: new-logo ARR plus expansion ARRThe sales team is paid and measured on bookings
Lost salesChurn and contraction on the ARR you start withA product company has no equivalent line, and in SaaS it can cancel out most expansion
Sales revenueSubscription revenue from average ARR, plus servicesARR signed mid-year only earns revenue from its start date
Cash collectionsBillings by term (annual upfront, quarterly, monthly)Cash follows the invoice terms, not the revenue
So a SaaS sales budget has two top lines: bookings, which sales commits to and gets paid on, and revenue, which the P&L reports. The example below shows both.

What goes into a sales budget?

Two sides: the sales you plan to make, broken into drivers, and the cost of the team and programs that make them. Each line needs a driver you can point to.
SideLineDriver
SalesNew-logo bookingsNew logos x ACV, by plan and quarter
SalesExpansion bookingsExpansion rate on beginning ARR, or a list of named upsells
SalesChurn and contractionChurn rate on beginning ARR, or the renewal list with risk flags
SalesSubscription and services revenueAverage ARR for the period; services fee per new logo
CostBase salariesHeads by role and quarter x base salary
CostCommissions and variable payCommission rate x the bookings budget, or variable pay at target
CostBenefits and payroll taxesA percentage of base salary
CostSales programsTools per head, travel per rep, recruiting per hire, kickoff, events
CheckRep capacityRamped reps x quota x expected attainment, plus new hires on a ramp curve
Marketing usually has its own budget. Put its total next to the sales cost anyway, because benchmarks and the CAC ratio use sales and marketing together.

How do you make a sales budget?

Start from last year's actuals, build bookings from units and price, check them against what the reps can produce, then cost the team. Eight steps:
  1. Pick the period and the grain. A year by quarter is the usual grain for a sales budget. Monthly works too, but the extra detail rarely helps a budget that is set once.
  2. Start from where the books end. Enter the ending ARR of last year and last year's actual sales cost. The budget grows from real numbers, not from a target someone picked.
  3. Set units and price by product and quarter. New logos x ACV for each plan. Do not spread the year evenly. Across ORM customers, Q4 is typically the largest quarter, followed by Q2, then Q3, then Q1, and within a quarter the third month is always the largest.
  4. Budget renewals and expansion separately from new business. Renewal amounts and dates are mostly known in advance. New business is not. One growth rate for both hides the risk in the new-logo number.
  5. Turn bookings into ARR and revenue. Beginning ARR, plus new-logo and expansion ARR, minus churn, equals ending ARR. Subscription revenue for a quarter is about the average of beginning and ending ARR divided by four.
  6. Check the bookings against productive capacity. Ramped reps at expected attainment, plus new hires at their point on the ramp. If capacity is short, hire earlier, change the mix or lower the number now. The method is in how to calculate sales headcount for a revenue target.
  7. Cost the team and the programs. Heads by role and quarter, base pay, commissions as a rate on the bookings budget, benefits, tools, travel, recruiting and kickoff. To plan those heads for every team over two years, with attrition and backfills, use the headcount planning template.
  8. Compare the ratios, then lock it. Sales and marketing as a percent of revenue, sales cost per dollar of bookings and the new CAC ratio against benchmarks and last year. Then set the quarterly review against actuals.

Sales budget example: a SaaS company at $12M ARR

Below is an illustrative FY2027 sales budget for a B2B SaaS company that starts the year with $12,000,000 of ARR and sells two plans. Every number is made up to show the mechanics, and the same company is in the example download, so you can trace each figure to a formula.

The company plans 60 Core logos at a $30,000 ACV and 20 Enterprise logos at a $90,000 ACV, weighted toward Q4 and Q2. Each new Core customer also buys $5,000 of onboarding and each Enterprise customer $20,000. Expansion runs at 12% a year and churn and contraction at 10% a year on beginning ARR, applied a quarter at a time. Those land near the Benchmarkit 2025 medians (2024 data) of 101% net revenue retention and 88% gross revenue retention.

Sales budget (revenue side)Q1Q2Q3Q4FY2027
Core plan new logos1216131960
Enterprise plan new logos454720
Core new-logo ARR ($30,000 ACV)$360,000$480,000$390,000$570,000$1,800,000
Enterprise new-logo ARR ($90,000 ACV)$360,000$450,000$360,000$630,000$1,800,000
New-logo ARR$720,000$930,000$750,000$1,200,000$3,600,000
Expansion ARR$360,000$383,400$413,217$437,783$1,594,400
Total bookings$1,080,000$1,313,400$1,163,217$1,637,783$5,194,400
Churn and contraction ARR$300,000$319,500$344,348$364,819$1,328,667
Ending ARR$12,780,000$13,773,900$14,592,770$15,865,733$15,865,733
Subscription revenue$3,097,500$3,319,238$3,545,834$3,807,313$13,769,884
Services revenue$140,000$180,000$145,000$235,000$700,000
Total revenue$3,237,500$3,499,238$3,690,834$4,042,313$14,469,884
Quarters can differ from the year by a dollar because of rounding. One quarter shows the math. Q1 starts at $12,000,000, books $720,000 of new-logo ARR, adds $360,000 of expansion (12% / 4) and loses $300,000 (10% / 4), ending at $12,780,000. Subscription revenue is ($12,000,000 + $12,780,000) / 2 / 4 = $3,097,500. Services revenue is counted in the quarter sold, which is a simplification: in practice it is recognized as the work is delivered.

Can the sales team sell it?

The budget only holds if the AEs can produce $3,600,000 of new-logo ARR, and that is a capacity question, not a quota question. In this example each AE carries an $800,000 quota, so $200,000 a quarter. The company has five ramped AEs, plans on 80% average attainment for them, and hires two AEs in Q1 and one in Q2.

I plan quota on a curve: average attainment around 75% to 80%, with a tail below and a tail above. If the business goal needs more than that, add heads instead of raising quotas until the average drops toward 50%. New hires are counted on a ramp. ORM measures ramp by role and region against full quota, and a representative AE curve from the patterns we have observed reaches 3%, 11%, 21% and 49% of quota in the first four quarters of tenure. In B2B SaaS it generally takes 15 to 18 months for a rep to become fully productive.

AE capacityQ1Q2Q3Q4FY2027
AE heads (5 ramped plus hires)7888
Assigned quota$1,400,000$1,600,000$1,600,000$1,600,000$6,200,000
Productive capacity, 5 ramped AEs at 80%$800,000$800,000$800,000$800,000$3,200,000
Productive capacity, 3 new hires on the ramp$12,000$50,000$106,000$238,000$406,000
Total productive capacity$812,000$850,000$906,000$1,038,000$3,606,000
Budgeted new-logo ARR$720,000$930,000$750,000$1,200,000$3,600,000
Capacity covers the year with $6,000 to spare. Read the gap on the year, since bookings land unevenly by quarter while capacity builds steadily. Three things stand out:
  • Assigned quota is not capacity. The team carries $6,200,000 of quota and is expected to produce $3,606,000, which is 58% of it. A budget that adds up quotas overstates new bookings by about $2.6M.
  • Hires made this year mostly pay off next year. A Q1 hire adds $200,000 x (3% + 11% + 21% + 49%) = $168,000 of new ARR in the year, against $640,000 from a ramped AE. A Q3 hire would add only $28,000. Without the three hires, the plan is $400,000 short.
  • The fix has to be found before the year starts. Capacity has to be hired before the business needs it. In ORM's capacity models, moving from a one-year to a two-year planning horizon reduces cost by roughly 5%, because shortages show up early enough to hire and ramp for them.

What the sales team costs

The cost side follows the same plan: heads by role and quarter, base pay, variable pay tied to the bookings budget, then benefits and programs. AEs have a $200,000 on-target earnings plan split 50/50, so the commission rate is $100,000 / $800,000 = 12.5% of new-logo ARR. Account managers earn 5% of expansion ARR. Other roles are paid variable at target.
RoleHeadsBase salariesVariable pay and commissionsHow variable pay is budgeted
Account executives7 in Q1, then 8$775,000$450,00012.5% of $3,600,000 new-logo ARR
Sales development reps4$240,000$80,000$20,000 each at target
Account managers2$180,000$79,7205% of $1,594,400 expansion ARR
Sales engineers2$280,000$40,000$20,000 each at target
Sales leadership1$200,000$80,000At target
Sales operations1$120,000$15,000At target
Total17 to 18$1,795,000$744,720
Sales expense budgetFY2027
Base salaries$1,795,000
Variable pay and commissions$744,720
Benefits and payroll taxes (22% of base)$394,900
Sales tools ($6,000 per head per year)$106,500
Travel and entertainment ($15,000 per AE per year)$116,250
Recruiting (20% of first-year base per AE hire)$60,000
Enablement and sales kickoff$40,000
Other sales programs$60,000
Total sales expense$3,317,370
Marketing (from its own budget)$2,000,000
Total sales and marketing$5,317,370
Sales and marketing as % of revenue36.7%
Sales expense per $1 of bookings$0.64
New CAC ratio, approximate (S&M less the AM team, over new-logo ARR)$1.39
Commissions here are budgeted as earned, in the quarter the bookings land. On a GAAP P&L, commissions that qualify are capitalized and amortized under ASC 340-40, so the expense line will be lower than this budget in a growing year. Finance usually keeps both views, and a three statement model shows how the capitalized asset and the cash payout differ from the P&L line.

How to read it:

  • Commissions move with bookings, salaries do not. If new-logo ARR comes in 10% low, AE commissions fall by $45,000, while $2.2M of base and benefits stays. That fixed share is why a missed bookings number hurts the cost ratios so quickly.
  • The ratios look healthy because the company is mid-sized and expansion-heavy. Sales and marketing at 36.7% of revenue sits next to the Benchmarkit median of 37%, and an approximate new CAC ratio of $1.39 beats the $2.00 median. A company that leans on new logos alone would land higher on both.
  • The new hires are an investment in next year. They cost $275,000 of base salary this year plus benefits, recruiting, tools and travel, and they add $406,000 of new ARR in the year. Their full value shows up in FY2028.

How much should a company budget for sales?

There is no right percentage, but SaaS benchmarks give a starting range: the median company spends 37% of revenue on sales and marketing together. That figure comes from Benchmarkit's 2025 SaaS Performance Metrics Benchmarks, based on 2024 data. The same report puts VC-backed companies at 47% and PE-backed companies at 33%.

Two other ratios help more than a percent of revenue, because they compare the cost with what it buys:

  • New CAC ratio. Sales and marketing spent to win $1 of new customer ARR. Benchmarkit reports a $2.00 median, up 14% in 2024, against a $1.00 median for expansion ARR.
  • Cost of sales ratio. Fully loaded sales cost over the new and expansion ARR it booked in the same period. The cost of sales ratio entry explains the operator and accounting versions and what goes on top of each.

Benchmarkit does not split sales from marketing, so use your own history for the split. A sales budget that is far above the median is not wrong if the new CAC ratio is fine. One that is near the median with a poor CAC ratio is spending in the wrong places.

How do you track the sales budget against actuals?

Compare each line every quarter: variance = actual minus budget, and variance % = variance / budget. For bookings and revenue a positive variance is favorable. For costs a positive variance is unfavorable. In the example, Q1 came in like this (actuals illustrative):
Q1 FY2027BudgetActualVarianceVariance %Result
New-logo ARR$720,000$690,000-$30,000-4.2%Unfavorable
Expansion ARR$360,000$342,000-$18,000-5.0%Unfavorable
Total revenue$3,237,500$3,206,000-$31,500-1.0%Unfavorable
Variable pay and commissions$161,750$152,000-$9,750-6.0%Favorable
Sales programs$146,750$151,200$4,4503.0%Unfavorable
Total sales expense$833,100$830,850-$2,250-0.3%Favorable
Total sales and marketing$1,333,100$1,350,850$17,7501.3%Unfavorable
The sales expense line looks on budget, and that is the trap. Bookings missed by 4.4% while cost stayed flat, so each dollar booked cost more than planned. Lower commissions are favorable only because the team sold less. Read cost variances next to the bookings variance, and use a variance analysis to split a miss into price, volume and mix. Across ORM customers Q1 is typically the smallest quarter, so a Q1 miss of this size is a warning, not yet a verdict. To explain how the actuals moved from one month to the next, with the budget set aside, use a flux analysis. The profit and loss template keeps those monthly actuals in one place.

What goes in each tab of the sales budget template?

Seven tabs: one to explain, one for every input, then the revenue side, the capacity check, the cost side, a one-page summary and budget vs actual. Yellow cells are inputs, grey cells are formulas.
TabWhat you do thereWhat it gives you
Start hereRead onceSteps, every formula in words, Google Sheets note, sources
InputsEnter beginning ARR, up to four plans with ACV, services fee and new logos per quarter, expansion and churn rates, AE quota, attainment, ramp curve and hires, eight roles with heads, base and variable pay, commission rates, benefits load, programs and marketingEvery assumption in one place, with the Benchmarkit medians
Sales budgetNothing; check itUnits x price by plan, the ARR bridge, bookings, subscription and services revenue, retention
CapacityNothing; check itAssigned quota vs productive capacity by quarter, the gap and an OK or short check
Expense budgetNothing; check itHeads, base salaries, commissions and variable pay by role, benefits, programs, marketing and total sales and marketing
SummaryRead itThe one-page sales budget with S&M % of revenue, sales cost per $1 of bookings, approximate new CAC ratio and four checks
Budget vs actualPick a quarter or the year, type actualsVariance in dollars and percent, marked favorable or unfavorable, with totals that add themselves up
The blank file has the same formulas with empty inputs and the representative ramp curve filled in for you to replace. This template covers the sales team only. For the whole company in one workbook, with every department's headcount, non-people spend and a P&L, use the annual operating plan template.

What mistakes make a sales budget fail?

Most sales budgets fail because the revenue line is built from targets instead of capacity, and the cost line is built from last year instead of the plan. These are the ones I see most.
MistakeWhat goes wrongFix
New bookings = the sum of quotasQuota includes the cushion for reps who miss and the reps still rampingBudget productive capacity: attainment and ramp applied
One company-wide rampAn SMB rep, an enterprise AE and a senior AE ramp on different curvesMeasure ramp by role and region against full quota
25% of the year in each quarterBookings land late in the year and late in each quarterWeight quarters by your own history
Renewals and new business in one growth rateRenewals have known amounts and dates; new business does notBudget new logos, expansion and churn separately
Revenue = bookingsARR signed during the year earns only part of the yearRevenue from average ARR
Commissions as a fixed numberThey do not move when bookings do, so the variance is meaninglessCommission rate x the bookings budget
Hiring planned in the same year as the gapA Q3 hire adds almost nothing this yearPlan capacity two years out
Budget set once and never comparedNobody sees the drift until Q4Quarterly budget vs actual and a reforecast
When the team cannot support the target, say so early. Check whether the product is still competitive, then call down the number or decline a larger one with the board. Bad news does not get better with time.

Where does ORM fit?

A sales budget is only as good as its two hardest inputs: the bookings the team can really produce and the ramp of the people you hire. ORM measures attainment and ramp by role, region and tenure from CRM data, builds capacity plans that choose which roles to hire, where and when, and forecasts new business, renewals and expansion separately. In the models ORM builds, optimizing that plan gets about 10% to 15% more productive capacity for the same sales budget, or the same target for 10% to 15% less cost. ORM targets 95% forecast accuracy from day 1 to day 90 of the quarter, so the reforecast next to the budget stays current. See revenue planning software for how it works on your own data.

Sources

All checked on October 25, 2026.

  • Benchmarkit, 2025 SaaS Performance Metrics Benchmarks (2024 data): sales and marketing 37% of revenue at median, 47% for VC-backed and 33% for PE-backed companies; New CAC Ratio median $2.00, up 14% in 2024; Expansion CAC Ratio median $1.00; net revenue retention median 101%; gross revenue retention median 88%.
  • ORM Technologies, observations across its customer base and its capacity models: quarter seasonality, renewals forecast separately from new business, planned attainment of 75% to 80%, the representative AE ramp curve, 15 to 18 months to full productivity, about 5% lower cost from a two-year planning horizon and 10% to 15% from optimized capacity plans.

Frequently Asked Questions

How do I calculate the sales budget?

Multiply the units you expect to sell by the price you expect to get, for each product and each period, then add the products together. In SaaS the units are new customers and the price is annual contract value, plus expansion from existing customers. Then budget the cost of the team that has to sell it: base pay, commissions, benefits and programs.

Can you provide an example of a sales budget?

A SaaS company starting the year at $12M of ARR plans 60 Core logos at $30,000 and 20 Enterprise logos at $90,000, which is $3.6M of new-logo ARR. With 12% expansion and 10% churn, it ends at $15.9M of ARR and books $14.5M of revenue. The sales team to win it costs $3.3M. All figures are illustrative.

How do you make a sales budget?

Pick the period, start from last year's actuals and ending ARR, set units and price by product and quarter, add expansion and churn, and turn ARR into revenue. Then check that ramped reps and new hires can produce the bookings, budget the team and programs, compare the ratios with benchmarks, and review actuals against the budget every quarter.

Is a sales budget the same as revenue?

A sales budget includes budgeted revenue, but in a subscription business the two numbers differ. Sales budgets bookings, the ARR it will sign. Revenue is what the P&L recognizes, and a deal signed in June only earns half a year. Most sales budgets also include what the sales team costs, which revenue alone does not show.

What is the difference between a sales budget and a sales forecast?

The budget is the plan you commit to before the year starts, and it does not change. The forecast is your current estimate of what will actually close, and it changes every week as deals move. You manage the gap between the two. A forecast that never differs from the budget usually means nobody updated the assumptions.

What is the formula for sales vs budget?

Variance equals actual minus budget, and variance percent equals that difference divided by budget. For revenue and bookings a positive variance is favorable. For costs a positive variance is unfavorable. A company that budgeted $720,000 of new-logo ARR and booked $690,000 is $30,000, or 4.2%, below budget.

ORM Technologies
Pete has built custom revenue forecast models for B2B SaaS companies for over a decade.

See how ORM turns these insights into action

ORM builds custom revenue forecast models for B2B SaaS companies. Not dashboards. Prescriptive analytics that tell you what to do next.

Schedule a Demo